Laserfiche WebLink
lines are inspected daily to ensure proper function and wear. Absorbent padding, buckets and <br />shovels are available on the active drill site. <br />All spillable material is placed into secondary containment that can hold 110% of the largest <br />volume container with the containment. Tarps are placed over the secondary containment to <br />avoid creating contaminated water during precipitation events. <br />Sumps are preferably placed on the uphill side of the drill pads, otherwise a berm is placed <br />around the downhill edge of a sump. Sumps are lined with bentonite to avoid seepage of the <br />drill water from the sump. <br />2.12. Plan for All Access Roads, Water Supply Pipelines and Power Lines <br />[43 CRF3809.401(b) (2) (01), No new access roads are proposed under this Plan. All existing <br />access roads will be maintained to minimize erosion with water diversion structures and will not <br />be unduly degraded during periods of high precipitation and saturated roadbed conditions. <br />Access through private fee lands to the drill sites is granted under an easement provision with <br />the Vickers Ranch held by LCA Gold. <br />Water for drilling will be purchased from the Town of Lake City and transported via water truck <br />to the 3 Level portal. From the 3 Level portal, water will be pumped via rubber water line to drill <br />sites located higher on the ridge. Work at the 3 Level portal is conducted under an existing <br />permit held by LKA Gold with the State of Colorado DRMS (#M -197M91 -UG) and is located on <br />private lands. <br />No temporary power lines will be used or constructed under this Plan. <br />