Laserfiche WebLink
h <br /> ti <br /> i <br /> +7 <br /> r <br /> i <br /> a <br /> Figure 5: Plan view of the mill platform area showing the lined area of the mill platform. The additional area to the <br /> southwest is also lined however it is not part of the sink or basin shown by the blue dashed perimeter. It is however <br /> tied into Phase 4 of VLF 1. Source:On-site surveying and as-built data,2014. <br /> As demonstrated above,Newmont has environmental controls in place that are adequate to <br /> contain any fluids not captured in the primary or secondary containment features already in <br /> place. In the event of an upset condition, Newmont has almost two orders of magnitude greater <br /> capacity in the tertiary containment,than in the existing secondary containment. In addition, <br /> capacity of the tertiary containment will be increased once the VLF 2 Phase I liner is tied-in to <br /> the HGM platform liner. Figure 4 indicates the VLF 2 Phase I liner location relative to the HGM <br /> lined platform. Completion of this connection to VLF 2 is anticipated by August 31St, 2016. <br /> Summary <br /> For the afore mentioned reasons,Newmont believes the updated primary containment controls in <br /> place and planned for the immediate future,the secondary containment features in place, and the <br /> tertiary containment are protective of the environment. <br /> Should you require further information please do not hesitate to contact me at(719) 689- 4055 or <br /> Meg Burtgnewmont.com. <br />