Laserfiche WebLink
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> there is no topsoil developed currently as entire area has been reclaimed in last 2-3 years- <br /> ground is covered with old tailings material and has been covered with mulch, zone 5 seed <br /> mix, and re-planted with pine saplings, if any, that will a re-planted after use of each pad, <br /> Of present. See photo <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> all holes will be cement grouted for entire length upon completion. <br /> 10. Describe how portals,adits,shafts,ponds, excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> mudpits will be cleaned of drill cuttings and filled in with original material stockpiled at <br /> excavation. Use of a solids recovery unit has not been ruled out, which may negate the <br /> need f6r excavating mud . <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br />