Laserfiche WebLink
E) AREA OF CONSTRUCTION SITE <br /> Total area of project site(Acres) 10 Area of project site to undergo disturbance(Acres) 9.5 <br /> Note:aside from clearing,grading and excavation activities,disturbed areas also include areas receiving overburden(e.g.,stockpiles),demolition areas, <br /> and areas with heavy equipment/vehicle traffic and storage that disturb existing vegetative cover <br /> Total disturbed area of Larger Common Plan of Development or Sale.If applicable: <br /> (i.e.,total,including all phases,filings,lots,and infrastructure not covered by this application) <br /> Provide both the total area of the construction site,and the area that will undergo disturbance,in acres.Note:aside from clearing,grading and excavation <br /> activities,disturbed areas also include areas receiving overburden(e.g.,stockpiles),demolition areas,and areas with heavy equipment/vehicle traffic and storage <br /> that disturb existing vegetative cover(see construction activity description under the APPLICABILITY section on page 1).If the project is part of a larger common <br /> plan of development or sale(see the definition under the APPLICABILITY section on page 1),the disturbed area of the total plan must also be included. <br /> F) NATURE OF CONSTRUCTION ACTIVITY <br /> Check the appropriate box(s)or provide a brief description that indicates the general nature of the construction activities.(The full description of activities must be <br /> included in the Stormwater Management Plan.) <br /> ❑ Single Family Residential Development <br /> Multi-Family Residential Development <br /> Commercial Development <br /> Oil and Gas Production and/or Exploration(including pad sites and associated infrastructure) <br /> Highway/Road Development(not including roadways associated with commercial or residential development) <br /> 0✓ Other—Description: Yard and Material Processing for Weld County Road 49 Construction <br /> G) ANTICIPATED CONSTRUCTION SCHEDULE <br /> Construction Start Date: 06/28/2016 Final Stabilization Date: 11/30/2017 <br /> • Construction Start Date-This is the day you expect to begin ground disturbing activities,including grubbing,stockpiling,excavating,demolition, <br /> and grading activities. <br /> • Final Stabilization Date-in terms of permit coverage,this is when the site is finally stabilized.This means that all ground surface disturbing <br /> activities at the site have been completed,and all disturbed areas have been either built on,paved,or a uniform vegetative cover has been <br /> established with an individual plant density of at least 70 percent of pre-disturbance levels.Permit coverage must be maintained until the site is <br /> finally stabilized.Even if you are only doing one part of the project,the estimated final stabilization date must be for the overall project. <br /> If permit coverage is still required once your part is completed,the permit certification may be transferred or reassigned to a new responsible <br /> entity(s). <br /> H) RECEIVING WATERS(If discharge is to a ditch or storm sewer,include the name of the ultimate receiving waters) <br /> Immediate Receiving Water(s): Box Elder Creek <br /> Ultimate Receiving Water(s): South Platte River <br /> Identify the receiving water of the stormwater from your site.Receiving waters are any waters of the State of Colorado.This includes all water courses,even if they <br /> are usually dry.If stormwater from the construction site enters a ditch or storm sewer system,identify that system and indicate the ultimate receiving water for the <br /> ditch or storm sewer.Note:a stormwater discharge permit does not allow a discharge into a ditch or storm sewer system without the approval of the owner/ <br /> operator of that system. <br /> SW Construction Application for. Ames Construction,Inc 06/15/2016 page 4 of 5 <br />