My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_PERMIT FILE - M2016041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016041
>
2016-08-08_PERMIT FILE - M2016041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 1:56:04 PM
Creation date
8/9/2016 10:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016041
IBM Index Class Name
PERMIT FILE
Doc Date
8/8/2016
Doc Name
Application
From
Ames Construction, Inc.
To
DRMS
Email Name
PSH
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> (d) There will be no features such as ponds, streams, roads or <br /> buildings remaining on the borrow area after reclamation. <br /> (e) All features have been previously addressed in the <br /> Reclamation Plan. <br /> (2) Cost estimate to reclaim the site. <br /> The point of maximum disturbance to site will be when the <br /> excavation activities are finished. Due to the configuration of <br /> the borrow, reclamation activities would not begin until that <br /> time. <br /> Since the excavation slopes were left at a 3:1 gradient during <br /> the borrow removal process, the remaining reclamation work <br /> would consist of removing the perimeter berms and placing the <br /> topsoil materials over the disturbed areas followed by the <br /> application of the recommended soil amendments, seed and <br /> mulch. <br /> 1 . Placement of salvaged topsoil: <br /> Quantity = 2,360 cubic yards <br /> Equipment: Self-loading scraper (similar to CAT 623) <br /> Dozer (similar to CAT D6) <br /> Labor: 2 equipment operators and '/2 time foreman <br /> Production rate: 130 cubic yards per hour <br /> Hours required to complete = 2,360/130 = 18 hours <br /> Equipment costs per hour = $ 240.00 <br /> Labor costs per hour = $ 150.00 <br /> Total per hour = $ 390.00 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.