Exhibit C <br /> Applicant: Ames Construction, Inc. <br /> Name of Site: Front Range Feed Lot Borrow <br /> Date: July 27, 2016 <br /> EXHIBIT C — Mining plan <br /> (a) Commencement and Duration of Borrow Operation <br /> The borrow operation is for a single specific project. <br /> Operations would begin on September 6, 2016 and would be <br /> complete by November 30, 2017. <br /> This time window includes the following phases: <br /> 1 . Topsoil salvaging and haul road construction; <br /> 2. Excavation and hauling of the borrow materials, <br /> 3. Excavation from the existing road brought back into the <br /> borrow hole <br /> 4. Closing of the borrow — final grading of the slopes, <br /> topsoil placement, and completion of the reclamation <br /> plan. <br /> (b) Topsoil replacement depth. <br /> The existing topsoil conditions in the area show an average of 3 <br /> inches. This topsoil will be stockpiled and respreads at the end <br /> at the depth or thicker. <br /> (c) Overburden <br /> The borrow materials do not have any overlying overburden or <br /> waste materials. <br /> (d) Thickness of deposit to be mined <br /> A ten foot thickness maximum of borrow material will be <br /> removed. <br /> Page 1 of 4 <br />