Laserfiche WebLink
Page 8 of 67 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br /> <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 7500 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />NA <br />Travel Time: <br /> Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 11000.00 3.00 3.00 6.00 1477 7.52 <br />Haul Time: 7.52 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 11000.00 -3.00 3.00 0.00 2965 3.82 <br />Return Time: 3.82 minutes <br />Total Scraper team cycle time: 12.94 minutes <br />Adjusted for job conditions: 223.21 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 223.21 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 446.43 LCY/Hour <br />Unadjusted unit production/hour: 268.93 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 97.34 Hours <br /> <br />Unit cost: <br /> <br />$3.741 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$162,565 <br />