My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-08-08_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:37 PM
Creation date
8/9/2016 8:58:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/8/2016
Doc Name
Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR4
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 27 of 67 <br /> <br />CIRCES Cost Estimating Software <br />Unit cost: $43.62 per acre Total job cost: $100,565 <br />BULLDOZER WORK <br /> <br />Task description: Section 25 Pond Removal <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 527 State: Colorado Abbreviation: None <br />Date: 8/5/2016 County: Moffat Filename: C019-527 <br />User: JHB <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $97.48 NA <br />Operating Cost/Hour: $103.60 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $239.97 <br />Total Fleet Cost/Hour: $239.97 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 11,667 <br />Swell factor: 1.125 <br />Loose volume: 13,125 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C6 <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 120 feet <br />Unadjusted hourly <br />production: <br />1,093.1 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 6,900 feet <br /> <br />Material weight: 2,650 lbs/LCY
The URL can be used to link to this page
Your browser does not support the video tag.