Laserfiche WebLink
Page 27 of 67 <br /> <br />CIRCES Cost Estimating Software <br />Unit cost: $43.62 per acre Total job cost: $100,565 <br />BULLDOZER WORK <br /> <br />Task description: Section 25 Pond Removal <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 527 State: Colorado Abbreviation: None <br />Date: 8/5/2016 County: Moffat Filename: C019-527 <br />User: JHB <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $97.48 NA <br />Operating Cost/Hour: $103.60 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $239.97 <br />Total Fleet Cost/Hour: $239.97 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 11,667 <br />Swell factor: 1.125 <br />Loose volume: 13,125 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C6 <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 120 feet <br />Unadjusted hourly <br />production: <br />1,093.1 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 6,900 feet <br /> <br />Material weight: 2,650 lbs/LCY