Laserfiche WebLink
Page 21 of 67 <br /> <br />CIRCES Cost Estimating Software <br />fabric - to 6 ft. <br />high <br />remove <br />fencing at <br />outside storage <br />500'l x 400'w Fencing, chain <br />link, including <br />posts and <br />fabric - 8 ft. to <br />10 ft. high <br />1,800.00 LF $3.05 $5,490.00 <br />Primary <br />crusher <br />420 ft. l Conveyor, <br />elevated, <br />including <br />supports - 8 ft. <br />W x 10 ft. H <br />housing <br />420.00 LF $53.42 $22,436.40 <br />remove <br />powerline <br />(map 22B) <br />24000 ft. Powerline or <br />utility line, <br />overhead, <br />wood - Double <br />or "H" pole <br />24,000.00 LF $5.39 $129,360.00 <br /> <br />Job Hours: 80.00 <br />Subtotal <br />(unadjusted): $1,207,076.74 <br />Total Cost <br />(adjusted for <br />location): $1,185,349.36 <br /> <br />