Laserfiche WebLink
Page 19 of 67 <br /> <br />CIRCES Cost Estimating Software <br />cut - Max. <br />10,000 ft. haul <br />Warehouse <br />floor <br />270'l x 92'w x 1'th Demo. and on- <br />site disposal in <br />existing pit, 12 <br />in. thick - Max. <br />10,000 ft. haul <br />45,000.00 SF $2.22 $99,900.00 <br />Weld Shop 120'l x 90'w x 35'h Bldg. (MN) <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />378,000.00 CF $0.22 $81,270.00 <br />weld shop <br />floor <br />120'l x 90'w x 1'th Demo. and on- <br />site disposal in <br />existing pit, 12 <br />in. thick - Max. <br />10,000 ft. haul <br />10,800.00 SF $2.22 $23,976.00 <br />Wash Bay 90'l x 75'w x 40'h Bldg. (MN) <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />270,000.00 CF $0.22 $58,050.00 <br />Shop floor 278'l x 205'w x <br />1'th <br />Demo. and on- <br />site disposal in <br />existing pit, 12 <br />in. thick - Max. <br />10,000 ft. haul <br />6,450.00 SF $2.22 $14,319.00 <br />Shop footers 253+253+153+153 Demo. and on- <br />site disposal in <br />existing pit, 1.0 <br />ft. x 2 ft. - <br />Max. 10,000 ft. <br />haul <br />812.00 LF $4.44 $3,605.28 <br />FuelTank <br />building <br />75'l x 60'w x 25'h Bldg. (SN) <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />112,500.00 CF $0.19 $21,262.50 <br />Fuel tank <br />building slab <br />75'l x 60'w x 1'th Demo. and on- <br />site disposal in <br />existing pit, 12 <br />in. thick - Max. <br />10,000 ft. haul <br />4,500.00 SF $2.22 $9,990.00 <br />Fuel Tanks 2 tanks Comprehensive <br />storage tank <br />removal, non- <br />leaking - 3,000 <br />to 5,000 gal. <br />tank <br />1.00 EA $3,866.20 $3,866.20 <br />Electric <br />substation <br />80'x 80'x 12'h Bldg. (SN) <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />76,800.00 CF $0.19 $14,515.20