My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-08_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:34 PM
Creation date
8/9/2016 8:42:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/8/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission
Permit Index Doc Type
Findings
Email Name
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />PR-04, Colowyo Coal Mine C1981-019 62 August 2016 <br /> <br />XVIII. Subsidence Control - Rule 4.20 <br /> <br />The Permit was found to comply with Rule 4.20. <br /> <br />Colowyo is mainly a surface coal mining operation. A small area was auger mined (see XXI <br />below). Subsidence over the auger mining was not considered a significant concern. The <br />possibility of large scale pillar failure over an area sufficient to produce surface effects was <br />considered very low (CTL/Thompson, Inc., Auger Mining Analysis, February 5, 1996). No <br />renewable resources or structures overlie the augered area, as discussed in the PAP (Rules <br />2.05.6(6) and 4.20). There is no current requirement for monitoring of subsidence by Colowyo at <br />the Colowyo Mine. <br /> <br />XIX. Coal Exploration - Rule 4.21 <br /> <br />Coal exploration outside the Permit boundary is authorized by other than this Permit, and is not <br />addressed in this finding. Coal exploration activity (resource confirmation) within the permit <br />area is found to be in compliance with applicable portions of Rule 4.21. <br /> <br />XX. Concurrent Surface and Underground Mining - Rule 4.22 <br /> <br />No concurrent surface and underground mining is planned for the Permit renewal period. <br /> <br />XXI. Auger Mining - Rule 4.23 <br /> <br />No auger mining is currently proposed in the mine plan. However, auger mining was done in <br />1993 in the Section 11 Pit. Further, highwall mining in the East Pit and West Pit has been <br />approved (PAP, pages 2.05-38a and 4.23-1) as well as in the South Taylor Pit (PAP, Rule 4, <br />pages 20 and 21). <br />XXII. Operations on Alluvial Valley Floors - Rule 4.24 <br /> <br />The Division has determined that the watersheds of Collom Gulch, Little Collom Gulch and <br />Morgan Gulch contain alluvial valley floors (AVFs). Surface coal mining and reclamation <br />operations at Colowyo, if conducted in compliance with the Permit, will preserve the essential <br />hydrologic functions of AVFs outside the permit area and will reestablish the essential <br />hydrologic functions of AVFs within the affected area, throughout the mining and reclamation <br />process (Rule 4.24.2). CCC has indicated that mining operations in the Collom area will not be <br />within the AVFs.
The URL can be used to link to this page
Your browser does not support the video tag.