Laserfiche WebLink
<br /> <br /> <br /> <br />STIPULATIONS <br /> <br />18 - COLOWYO COAL COMPANY WILL CONSTRUCT A GROUNDWATER <br />MONITORING WELL COMPLETED IN THE TROUT CREEK SANDSTONE. FOLLOWING <br />COMPLETION OF THE WORK, A MINOR REVISION WILL BE SUBMITTED TO UPDATE <br />THE PERMIT APPLICATION PACKAGE WITH A COMPLETE DESCRIPTION OF THE <br />WELL, AND TO UPDATE TABLES 2.04.7-38, -39, -40 AND -41, AND MAPS 10B AND 11C. <br />THE REVISION WILL BE SUBMITTED NO MORE THAN 90 DAYS AFTER WELL <br />COMPLETION. THESE ACTIONS MUST BE COMPLETED BEFORE ANY DISTURBANCE <br />ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />19 - DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR REVISION BE <br />SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF <br />VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY DISTURBANCE <br />ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />20 - A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING WELLS <br />MUST BE IN PLACE, AND A MINOR REVISION TO THE PERMIT SUBMITTED AND <br />APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF VOLUME 1 OF THE <br />PERMIT APPLICATION PACKAGE, BEFORE ANY DISTURBANCE ASSOCIATED WITH <br />THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />21 - COLOWYO COAL COMPANY WILL CONSTRUCT GROUNDWATER POINT OF <br />COMPLIANCE MLC-04-02, AND CARRY OUT STANDARD WELL TESTS TO ESTIMATE <br />AQUIFER PROPERTIES. FOLLOWING COMPLETION OF THE WORK A MINOR <br />REVISION WILL BE SUBMITTED TO UPDATE THE PERMIT APPLICATION PACKAGE <br />WITH A COMPLETE DESCRIPTION OF THE WELL, AND TO UPDATE TABLES 2.04.7- <br />38, -39, -40 AND -42. MAPS 10B AND 11C SHOULD ALSO BE UPDATED. THESE <br />ACTIONS SHOULD BE COMPLETED BEFORE THE END OF CALENDAR YEAR 2016. <br /> <br />22 - CONDUCT ADDITIONAL BASELINE ASSESSMENTS OF ALL SITES ELIGIBLE TO <br />BE NATIONAL REGISTER OF HISTORIC PLACES AND “NEED DATA” SITES WITHIN <br />THE PROPOSED COLLOM PERMIT EXPANSION AREA BOUNDARY. <br /> <br /> <br />