Laserfiche WebLink
Technical Memorandum <br /> Phase 2 Sediment Pond Jurisdictional Dam Evaluation ■ <br /> NewFields Job No.475.0106.006 <br /> August 8,2016 <br /> To provide perspective and to verify the evaluation presented herein, NewFields visually <br /> inspected the downstream side of the emergency spillway and Phase 2 Sediment Pond <br /> embankment. The Photo below clearly depicts a dam structure that is 6.5 feet above the <br /> natural ground and is consistent with dam height values developed from comparing as-built <br /> and native topographic data sets for the structure. <br /> DOWNSTREAM OF EMERGENCY SPILLWAY <br /> Emergency Spillway <br /> Approximately 6.5' <br /> � Inferred Natural <br /> ' Groand <br /> Mm <br /> Following the guidelines presented in Rule 4.2.5.2, it is clear that the Phase 2 Sediment Pond <br /> associated with Squaw Gulch VLF is not a Jurisdictional Dam. <br /> Page 5 <br />