Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclaim Admin Building <br />Site: Colowyo Coal Mine Permit Action: TR107 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/5/2016 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C 1981019 <br />Abbreviation: None <br />Filename: CO 19-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />Haul Topsoil from Pile 17A to Admin Building <br />TRUCKI <br />2 <br />1 <br />1 <br />0.39 <br />$2,961.00 <br />$1,161.00 <br />$1,201.00 <br />Replace Topsoil at Admin Building DOZER <br />4.48 <br />Reseed Admin Building REVEGE <br />0.80 <br />Total = <br />$0.00 <br />SUBTOTALS: <br />5.67 <br />S5,323 <br />I 10 111 .111 Dreylrcsffiff&� <br />Ca]�/ X1:4: foTril�i)�t]Z�] �1M Ilr <br />Liability insurance: <br />2.02 <br />Total = <br />$107.52 <br />Performance bond: <br />1.05 <br />Total = <br />$55.89 <br />Job superintendent: <br />2.83 <br />Total = <br />$210.78 <br />Profit: <br />10.00 <br />Total = <br />$532.30 <br />Total = <br />$0.00 <br />TOTAL O & P = <br />$906.49 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) = <br />$6,229.49 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />2.00 <br />Total = <br />$124.59 <br />Reclamation management and/or administration: <br />1.91 <br />$118.98 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$1,150.06 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$6,473.06 <br />