Laserfiche WebLink
July 20,2016 C-1981-012/New Elk Mine RAR <br /> Photo 7: Containment area 3 and <br /> ground water monitoring station. <br /> 1 <br /> y., <br /> TOPSOIL -Rule 4.06 <br /> Removal 4.06.2; Storage and Protection 4.06.3: <br /> o Topsoil piles (soil storage area and topsoil pile#2) were adequatly marked as such. <br /> o Recent road expansion yielded topsoil for recovery and storage (photo 6). This topsoil was placed <br /> on the pile and will be hydroseeded as soon as possible to take advantage of July and August rains <br /> for establishing seedllings. <br /> Topsail stockpile <br /> Photo 8• Topsoil Stockpile Photo 9: Sediment control materials <br /> EXCESS SPOIL and DEVELOPMENT WASTE-Rule 4.09 <br /> Placement;Drainage Control; Surface Stabilization: <br /> There are three wase disposal areas: <br /> 1. Refuse Disposal Area(RDA) <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 7 of 10 <br />