Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page l of 2 <br /> BULLDOZER WORK <br /> Task description: Backfill pits <br /> Site: Lee No 2 Placer Permit Action: 2016 Bond Calculation Permit/Job#: M 1987072 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: _None <br /> Date: 2/l/2016 County: Gilpin Filename: M072-001 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D3K XL-3P <br /> Horsepower: 74 --_ <br /> Blade Type: _Power Amzle Tilt _ <br /> Attachment: NA <br /> Shift Basis: . t per da,: <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $15.53 NA <br /> Operating Cost/Hour: $21.49 _ 100 <br /> Ripper own. Cost/Hour; _ $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1� 0 <br /> Operator Cost/Hour: $38.89 j NA <br /> Total unit Cost/Hour: $75.91 _ <br /> Total Fleet Cost/Hour: $75.91 v <br /> MATERIAL QUANTITIES <br /> Initial Volume: 100 _ <br /> Swell factor: _1.000 <br /> Loose volume: IN LCY <br /> Source of estimated volume, Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly production: 100.0 LCY/hr `T <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push gradient: 0% <br /> Average site altitude: 8,100 feet <br /> Material weight: 2,900 Ibs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: _ _0.750 (AVG.) <br /> Material consistency: _ _ 1.200 4CAT HB) <br /> Dozing method: _ 1.000 (GEN.) <br /> Visibility: __ __ 1.000 (AVG.) _ <br />