Laserfiche WebLink
material will be collected for treatment of the topsoil prior to using it to fill the open cut as required in <br /> the reclamation process. <br /> Final grading can then proceed and will be graded to match the original slopes as indicated in Exhibit F.1, <br /> "Reclamation Plan Map".The approximate range of slope gradient at reclaimed areas is 5:1 to 3:1. <br /> RA2100\2186.00 Arkins Park Permit\DOCUMENTS\AMENDED PERMIT\Exhibit E-Reclamation Plan.docx <br />