My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-17_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-06-17_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:52 PM
Creation date
8/5/2016 8:12:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/17/2016
Doc Name
SouthTaylor in-Pit Exploration Drilling Program
Section_Exhibit Name
Exhibit 23A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 23A <br />I. INTRODUCTION <br />The South Taylor In -Pit Drilling Program will consist of drilling 29 drill holes (Please see <br />Exhibit 23A) in order obtain data to update and improve the South Taylor Geologic Model. All <br />drill holes under this program will be drilled within the confines of the South Taylor Pit except <br />five holes which will be drilled on the end wall and low wall of the South Taylor Pit. The entire <br />area to be drilled occurs within areas that have already been disturbed by mining and are <br />included under Colowyo's current reclamation liability. Planned drill holes will be drilled to <br />approximately 20 feet below the G8 seam which is the lower most seam in the mining sequence. <br />II. SEALING OF DRILLED HOLES <br />Drill holes shown on Table Exh. 23A-1 will be completely or partially mined through, and will <br />be reclaimed in accordance with Section 2.05.4 in Volume 1. <br />Pursuant to Rule 4.07.3, drill holes shown in Table Exh. 23A-2 will be plugged with bentonite <br />mud and capped with concrete as these holes will not be mined through. Concrete and water will <br />be poured into the hole from ten feet to three feet below the surface and the final three feet will <br />be filled with soil. <br />Exhibit 23A 1 Revision Date: 5/24/16 <br />Revision No.: MR -153 <br />