Laserfiche WebLink
RECEIVED <br /> AUG 022016 <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> L Legend: <br /> - Completed and paved entry road <br /> -Current mining phase <br /> - Fill for reclamation <br /> MmronnO w" -Screening berms <br /> Four Sisters Parcel - � �••... -Stored topsoil for reclamation <br /> owned by SSG,LLCMAW <br /> -will not be mined MA i l <br /> it <br /> ui W.c <br /> kft <br /> nue. <br /> 0 <br /> �C3 <br /> o Notes <br /> U 1.Phase 1A will be used as the processing area during <br /> mining.This area will be surrounded by a visual protection <br /> 0 ;` berm throughout the mine life. See Visual Impact Analysis <br /> M_Itwtl g wen sheet VI.100 for more detailed information. <br /> 2.Two phases will be disturbed at a time,one being mined <br /> 5Y�3. and the other being reclaimed.The maximum disturbance <br /> during most of the mine life will be approximately 10 acres. <br /> This does not include the 14.5 acres in the Phase I <br /> processing area. <br /> W66 <br /> Steamboat Sand & Gravel Mine <br /> �(:.f�Iswlekl ArW A..o[I�1..,1•I.I.0 <br /> o' 1W OW .6 <br /> Mm4oring Well FJ ICJ t^=eoo. county SUP submittal 4-12-2010 MP.100 <br /> 0 <br />