Laserfiche WebLink
5.0 CONCLUSION <br />It has been at least 10 years since the last seeding effort on the Irrigated Pasture Phase III Bond <br />Release Block. Revegetation evaluation in 2014 and 2015 revealed that the Irrigated Pasture Phase III <br />Bond Release Block exceeds all applicable performance standards from the New Horizon permit. <br />Page 20 <br />