My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-28_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-07-28_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:18 PM
Creation date
8/4/2016 7:35:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
7/28/2016
Doc Name
Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
SL19
Email Name
BFB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon Mine <br />Permit No. C-1981-008 <br />2014-2015 PHASE III REVEGETATION EVALUATION REPORT <br />PHASE II BOND RELEASE BLOCK: REFERENCE AREA: <br />IRRIGATED PASTURE REVEGETATION IRRIGATED PASTURE <br />1.0 INTRODUCTION <br />IME was contracted in 2014 and Cedar Creek Associates, Inc. (Cedar Creek) in 2015 by New Horizon <br />Mine (New Horizon) to evaluate revegetated units for Phase III bond release. Data collection was <br />performed in the interest of ascertaining progress toward revegetation success in accordance with Permit <br />Section 2.05.4(2)(e). The bond release block evaluated in 2014-2015 consisted of 225.8 acres of <br />Irrigated Pasture revegetation (Map 1). Overall, the entire bond release application is 280.2 acres. <br />However, this report only addresses the 225.8 acres of Irrigated Pasture. In addition, the Irrigated <br />Pasture Reference Area was evaluated to provide cover and production values to facilitate a comparison <br />of success for the reclaimed units. The sample points for Phase III bond release and reference areas <br />evaluated in 2014-2015 are provided on Maps 2 through 5. Grazing and other land management <br />activities were precluded from the Phase III Bond Release Area and reference area until vegetation <br />sampling was completed in 2014 and 2015. Irrigation waters were generally applied in equal amounts on <br />the reclamation and reference area. <br />Sampling on Irrigated Pasture Phase III Bond Release Block and Reference Area occurred July, 2014 <br />by IME and June 1-4, 2015 by Cedar Creek. Field efforts in 2014 were conducted by or under the direct <br />supervision of IME's principal ecologist, Mr. Kent Crofts. Field efforts in 2015 were conducted by or under <br />the direct supervision of Cedar Creek's Reclamation Ecologist, Mr. Jesse Dillon. Cedar Creek has <br />prepared this report. New Horizon Mine has determined acreages presented in this document. Raw data <br />tables are presented in Appendix A. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.