My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-09_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-08-09_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 10:03:07 AM
Creation date
8/4/2016 6:44:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
8/9/2016
Doc Name
Adequacy Review
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
TR73
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining and Safety <br />August 1, 2016 <br />Page 2 <br />4. Map 2.03.4-2 Oil, Gas and Coal Ownership and Leases Map was not updated to reflect <br />the new permit boundary. Please update this map. <br />Response: Map 2.03.4-2 has been updated to reflect the new permit boundary. <br />Section 2.04 Hydrology Description <br />Maps 2.04.7-2, -3 and -4 are being requested for removal from the permit. These maps <br />contain baseline information that is not available elsewhere in the permit. The Division <br />requests that these maps remain in the permit. <br />Response: The request to remove Maps 2.04.7-2, -3 and -4 from the PAP is no longer <br />proposed. <br />Section 2.05.3 Mine Facilities <br />Map 2.05.3(3)-8 Mine Roads, is being requested for removal from the permit. Although <br />most of the roads depicted on the map have been Phase III released, the SE part of 5th <br />Street, section 0+00 to 24+50 is still a permitted road and has not been released_ . This <br />map needs to remain in the permit to document this small section of 5th Street. <br />Response: The request to remove Map 2.05.3(3)-8 from the PAP is no longer proposed <br />and the map revised to only show roads that have not received Phase III bond release. <br />Section 2.05.4 Reclamation Plan <br />On Map 2.05.4-4 Post Mining Topsoil Replacement, the northwest part of the permit area <br />is labeled with red horizontal lines which are described in the legend as Benson, ERM&R <br />(Lloyd), & ERM&R (Johnson) but does not include a topsoil placement description. <br />Please give a topsoil placement description for the area or reference the appropriate <br />location of the topsoil description. <br />Response: The legend of Map 2.05.4-4 has been updated to reference the location of the <br />topsoil description. <br />2. Map 2.05.4-7 needs to have the permit boundary updated. <br />Response: Map 2.05.4-7 was removed from the PAP in the TR -70 application and the <br />information contained on the map was consolidated under Map 2.05.4-9. <br />AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy' CooperativeQ <br />t� <br />
The URL can be used to link to this page
Your browser does not support the video tag.