My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_REVISION - M1993035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993035
>
2016-08-01_REVISION - M1993035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 3:58:54 AM
Creation date
8/2/2016 11:18:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993035
IBM Index Class Name
Revision
Doc Date
8/1/2016
Doc Name
Request for Technical Revision
From
Summit County Colorado
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PI Pit VC V.APPLICABLE STANDARDS/RISK DETERMINATION 9NA <br /> + Remediation system design diagrams showing how the <br /> system will be constructed in the field. <br /> + A remediation system operation and maintenance plan 32 <br /> that describes, at a minimum, how the system will be operated to <br /> ensure that it functions as designed without interruptions and a <br /> sampling program that wilt be used to monitor its effectiveness in <br /> achieving the desired goal. <br /> + The plan should describe the sampling program that will 29 <br /> be used to verify that treatment of the contaminated media has <br /> _ resulted in attainment of the proposed clean-up goals. <br /> + • The plan should include a schedule of implementation. 32 <br /> + The clean-up completion report is necessary to demonstrate that the Submit <br /> remediation was completed according to the application.Again,since in <br /> remediation is involved, the report is beyond the scope of a Phase I or II Future <br /> assessment. The following items should be included in the completion <br /> report <br /> + A final list of all site contaminants,along with the Submit <br /> remaining concentrations,and any deviations from the original in <br /> plan. Future <br /> + - A final list defining which media are contaminated and the Submit <br /> estimated vertical and areal extent of contamination to each in <br /> medium. Future <br /> + A final list and map defining all source areas,areas of Submit <br /> contamination or contaminant discharge areas. in <br /> Future <br /> Soil Contamination_ Remediation by Excavation Only. NA <br /> + One confirmation sample per 500 as measured at the NA <br /> base on the excavation OR two confirmatory samples,whichever <br /> method results in the collection of the most samples. <br /> + One composite sample from each wall of the excavation. NA <br /> In excavations of an irregular shape,one composite sample for <br /> every 100 lineal feet of waif. For excavations grater than 5000 ftz, <br /> preparation of a grid for randomization of sampling. <br /> + Explanation of the sampling method in the narrative as NA <br /> well as any modifications to 1 and 2 above used to better <br /> characterize the remedial efforts. <br /> + If contamination is to be left in place, an additional sample NA <br /> should be collected from the area of the worst contamination,as <br /> verified or with a field-sampling device. <br /> + Depth of samples collected NA <br /> + Provision of waste disposal manifests NA <br /> iZii0y3t Tiger VCtlP App!"ication _.�.�... .__,... Page 8 of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.