Laserfiche WebLink
21"0 lc3q <br />z. c3 <br />G% <br />610 G.io <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />3.00 <br />EA <br />$3.47 <br />$10.41 <br />locationlidentiticatio <br />n marker (EA. <br />material cost onh ) <br />Drill Rig and <br />SCHRAMM <br />NA <br />NA <br />40.60 <br />EA <br />$270.9 <br />$11,001.7 <br />Labor <br />T450BFI <br />8 <br />9 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />40.60 <br />EA <br />$71.88 <br />$2,918.33 <br />Gal. <br />Seal 6N1N Water <br />Portland cement <br />13 <br />1300 <br />267.00 <br />bag <br />$11.00 <br />$2.937.00 <br />Borehole <br />grout ( Bag, material <br />cost only -94 Ib. <br />bag) <br />Bottom Plug <br />PVC plug- 12 in. <br />13 <br />NA <br />1.00 <br />EA <br />$136.3 <br />$136.38 <br />diameter borehole <br />8 <br />Cut Casing at <br />Exposed casing <br />13 <br />3.4 <br />3.40 <br />LF <br />$1.76 <br />$5.98 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identificatio <br />n marker (EA, <br />material cost only) <br />Drill Rig and <br />SCHRAMM <br />NA <br />NA <br />13.50 <br />EA <br />$270.9 <br />$31658.23 <br />Labor <br />T450BH <br />8 <br />Wate rTruck <br />Water Tanker, 3,500 <br />NA <br />NA <br />13.50 <br />EA <br />$71.88 <br />$970.38 <br />Gal. <br />Seal 6MN <br />Portland cement <br />13 <br />1300 <br />267.00 <br />bag <br />$11.00 <br />$2,937.00 <br />Material Drop <br />grout ( Bag. material <br />Borehole <br />cost only...94 Ib. <br />bag) <br />Bottom Plug <br />PVC plug - 12 in. <br />13 <br />NA <br />1.00 <br />EA <br />$136.3 <br />$136.38 <br />diameter borehole <br />8 <br />Cut Casing at <br />Exposed casing <br />13 <br />3.4 <br />3.40 <br />LF <br />$1.76 <br />$5.98 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identificatio <br />n marker (EA. <br />material cost only) <br />Drill Rig and <br />SCHRAMM <br />NA <br />NA <br />13.50 <br />EA <br />$270.9 <br />$3.658.23 <br />Labor <br />T450B11 <br />8 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />13.50 <br />EA <br />$71.88 <br />$970.38 <br />Gal. <br />Seal 6MN Rock <br />Portland cement <br />13 <br />1300 <br />267.00 <br />bag <br />$11.00 <br />$2,937.00 <br />Dust Borehole <br />grout ( Bag, material <br />cost only -94 Ib. <br />bag) <br />Bottom Plug <br />PVC plug - 12 in. <br />13 <br />NA <br />1.00 <br />EA <br />$136.3 <br />$136.38 <br />diameter borehole <br />8 <br />Cut Casing at <br />Exposed casing <br />13 <br />3.4 <br />3.40 <br />LF <br />$1.76 <br />$5.98 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identificatio <br />n marker (EA, <br />material cost only) <br />