Laserfiche WebLink
///.4/G" /a <br />Borehole Plug <br />PVC plug - 10 in. <br />9.6" <br />NA <br />2.00 <br />EA <br />$99.54 <br />$199.08 <br />diameter borehole <br />Markers <br />Borehole <br />NA <br />NA <br />2.00 <br />EA <br />$3.47 <br />$6.94 <br />location/identi ficatio <br />n marker (EA, <br />material cost only) <br />Cut Casings at <br />Exposed casing <br />9.6 <br />5.03 <br />5.03 <br />LF <br />$1.76 <br />$8.85 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Drill Rig and <br />SCI-IRAN/IM <br />NA <br />NA <br />37.50 <br />EA <br />$270.9 <br />$10,161.7 <br />Labor <br />T450BH <br />8 <br />5 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />37.50 <br />EA <br />$71.88 <br />$2,695.50 <br />Gal. <br />Seal Monitoring <br />Portland cement <br />9.6 <br />1550 <br />173.00 <br />bag <br />$11.00 <br />$1.903.00 <br />Well MR279 <br />grout ( Bag, material <br />cost only...94 Ib. <br />bag) <br />Plug <br />PVC plug - 10 in. <br />9.6" <br />NA <br />1.00 <br />EA <br />$99.54 <br />$99.54 <br />diameter borehole <br />Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />locat ion/identi fi cat io <br />n marker (EA, <br />material cost only) <br />Cut Casing at <br />Exposed casing <br />9.6 <br />2.51 <br />2.51 <br />LF <br />$1.76 <br />$4.42 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Drill Rie and <br />v <br />SCI-IRAMM <br />NA <br />NA <br />16.10 <br />EA <br />$270.9 <br />$4.362.78 <br />Labor <br />T450BFI <br />8 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />16.10 <br />EA <br />$71.88 <br />$1.157.27 <br />Gal. <br />Seal 10 WCR <br />Portland cement <br />10.7' <br />16000 <br />1,201.00 <br />bag <br />$11.00 <br />$13,211.0 <br />Coreholes; <br />grout ( Bag, material <br />/7.87" <br />0 <br />MR280 <br />cost only...94 Ib. <br />bag) <br />Plugs <br />PVC plug - 12 in. <br />10.7' <br />NA <br />10.00 <br />EA <br />$136.3 <br />$1.363.80 <br />diameter borehole <br />8 <br />Markers <br />Borehole <br />NA <br />NA <br />10.00 <br />EA <br />$3.47 <br />$34.70 <br />location/identificatio <br />n marker (EA. <br />material cost only) <br />Cut Casings at <br />Exposed casing <br />10.7 <br />28.01 <br />28.01 <br />LF <br />$1.76 <br />$49.30 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />pDrill Rig and <br />SCI-IRAMM <br />NA <br />NA <br />166.50 <br />EA <br />$270.9 <br />$=45,118.1 <br />Labor <br />T450BFI <br />8 <br />7 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />166.50 <br />EA <br />$71.88 <br />$11.968.0 <br />Gal. <br />2 <br />5MN Bottom <br />PVC plug - 10 in. <br />9.875 <br />NA <br />1.00 <br />EA <br />$99.54 <br />$99.54 <br />Plug MR283 <br />diameter borehole <br />Seal 5MN <br />Portland cement <br />9.875" <br />1500 <br />177.00 <br />bag <br />$11.00 <br />$1,947.00 <br />Borehole <br />grout ( Bag, material <br />MR283 <br />cost only...94 Ib. <br />bag) <br />Cut Casing at <br />Exposed casing <br />9.875 <br />2.59 <br />2.59 <br />LF <br />$1.76 <br />$4.56 <br />Surface <br />removal - Calculate <br />