Laserfiche WebLink
Cil-CLlmference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identifi catio <br />n marker (EA, <br />material cost only) <br />Drill Rig and <br />SCHRAMM <br />NA <br />NA <br />14.50 <br />EA <br />$270.9 <br />$3.929.21 <br />Labor <br />T450B1-I <br />8 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />14.50 <br />EA <br />$71.88 <br />$1,042.26 <br />Gal. <br />Seal 18LT MAC <br />Portland cement <br />8.624 <br />1390 <br />125.00 <br />bag <br />$11.00 <br />$1.375.00 <br />Borehole <br />grout ( Bag, material <br />cost only ... 94 Ib. <br />bag) <br />Bottom Plug <br />PVC plug - 8 in. <br />8.624 <br />NA <br />1.00 <br />EA <br />$72.66 <br />$72.66 <br />diameter borehole <br />Cut Casing at <br />Exposed casing <br />8.624 <br />2.25 <br />2.25 <br />LF <br />$1.76 <br />$3.96 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identilicatio <br />n marker (EA, <br />material cost only) <br />Drill Rig and <br />SCHRAMIvI <br />NA <br />NA <br />14.50 <br />EA <br />$270.9 <br />$3,929.21 <br />Labor <br />-I-450BI-I <br />8 <br />Water Truck <br />Water"1-anker,3,500 <br />NA <br />NA <br />14.50 <br />EA <br />$71.88 <br />$1,042.26 <br />Gal. <br />Seal 18LT <br />Portland cement <br />8.624 <br />1390 <br />125.00 <br />bag <br />$11.00 <br />$1,375.00 <br />Dewatering <br />grout ( Bag, material <br />Borehole <br />cost only ... 94 Ib. <br />bag) <br />Bottom Plug <br />PVC plug - 8 in. <br />8.624 <br />NA <br />1.00 <br />EA <br />$72.66 <br />$72.66 <br />diameter borehole <br />Cut Casing at <br />Exposed casing <br />8.624 <br />2.25 <br />2.25 <br />LF <br />$1.76 <br />$3.96 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identiticatio <br />n marker (EA. <br />material cost only) <br />Drill Rig and <br />SCHRAMM <br />NA <br />NA <br />14.50 <br />EA <br />$270.9 <br />$3,929.21 <br />Labor <br />T450BH <br />8 <br />Water Truck <br />Water Tanker, 3,500 <br />NA <br />NA <br />14.50 <br />EA <br />$71.88 <br />$1,042.26 <br />Gal. <br />Seal 19RT <br />Portland cement <br />17 <br />1700 <br />595.00 <br />bag <br />$11.00 <br />$6,545.00 <br />Dewatering <br />grout ( Bag, material <br />Borehole <br />cost only ... 94 Ib. <br />bag) <br />Bottom Plug <br />PVC plug - 12 in. <br />17 <br />NA <br />1.00 <br />EA <br />$136.3 <br />$136.38 <br />diameter borehole <br />8 <br />Cut Casing at <br />Exposed casing <br />17 <br />4.45 <br />4.45 <br />LF <br />$1.76 <br />$7.83 <br />Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identilicatio <br />