Laserfiche WebLink
NORW EST ENGINEERING EVALUATION OF OVERHEAD POWER <br /> Juw 28,2016 <br /> COR PORAT ION PAGE 2 OF 2 <br /> MEMORANDUM <br /> Conclusions <br /> Overhead electric distribution lines exist within 200 feet of the proposed Hitch Rack Ranch Quarry permit <br /> boundary. These power lines are located along the access road, and none are located in the mining areas. <br /> Construction around overhead power lines is extremely common, and the construction crews will follow <br /> standard operating procedures and Colorado Springs Utility or Black Hills Energy guidelines for working <br /> around overhead power. Also, no elevated loads will be required or allowed to operate in the area of the <br /> power lines or a spotter will be used. Thus, there is little chance for construction of the access road to <br /> impact the overhead power lines. <br /> Engineer Certification <br /> This engineering evaluation of overhead power lines is complete and accurate to the best of my <br /> knowledge. <br /> o�Pp O..L/CJ. <br /> • �8 <br /> moo.%'�%�-� .•�� <br />