Laserfiche WebLink
NORWEST ENGINEERING EVALUATION OF OVERHEAD POWER <br /> JULY 28,2016 <br /> C O R P O R A T 1 O N PAGE 2 OF 2 <br /> MEMORANDUM <br /> Conclusions <br /> Overhead electric distribution lines exist within 200 feet of the proposed Hitch Rack Ranch Quarry permit <br /> boundary. These power lines are located along the access road, and none are located in the mining areas. <br /> Construction around overhead power lines is extremely common, and the construction crews will follow <br /> standard operating procedures and Colorado Springs Utility or Black Hills Energy guidelines for working <br /> around overhead power. Also, no elevated loads will be required or allowed to operate in the area of the <br /> power lines or a spotter will be used. Thus, there is little chance for construction of the access road to <br /> impact the overhead power lines. <br /> Engineer Certification <br /> This engineering evaluation of overhead power lines is complete and accurate to the best of my <br /> knowledge. <br /> O,RPD 0•'L ICF� <br /> v /. �OJ,•.Fa <br /> �g <br /> 1�ss70NAI.E�C� <br />