My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-28_REVISION - M2008006
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008006
>
2016-07-28_REVISION - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 10:51:30 PM
Creation date
7/29/2016 1:00:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
Revision
Doc Date
7/28/2016
Doc Name
Request for Technical Revision
From
Connell Resources Inc
To
DRMS
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�o COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> MINERALS PROGRAM INSPECTION REPORT <br /> * 7 ' PHONE: (303) 866-3567 <br /> ��86 <br /> The Division of Reclamation,Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> SerFer Pit M-2008-006 Gravel and sand Larimer <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Surety Release Inspection Michael A. Cunningham June 17,2016 11:15 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Connell Resources,Inc. Kevin Anderson 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Normal I&E Program Complete Bond $328,445.00 <br /> DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INS/'y� OAS SIGNATURE: SIGNATURE DATE: <br /> Clear :,� June 28,2016 <br /> The following inspection topics were identified as having Problems or Possible Violations OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Reclamation Success <br /> PROBLEM/POSSIBLE VIOLATION: Problem: Failure to follow approved reclamation plan, or current reclamation <br /> plan needs to be updated and clarified pursuant to C.R.S. 34-32.5-116 (1). The operator must follow the <br /> approved reclamation plan or provide sufficient information to describe or identify how the operator intends to <br /> conduct reclamation. <br /> CORRECTIVE ACTIONS:The operator shall submit a Technical Revision, with the required $216 revision fee, to <br /> update and clarify the current approved reclamation plan to reflect existing and proposed activities by the <br /> corrective action date. The Technical Revision shall include a revised Reclamation Plan Map which depicts the <br /> final contours of the site as well as an explanation of why a small depression was left in place south of the <br /> existing reservoir. <br /> CORRECTIVE ACTION DUE DATE: 7/29/16 <br /> INSPECTION TOPIC: Revegetation <br /> PROBLEM/POSSIBLE VIOLATION: Problem: There are state-listed noxious weeds present on site. This is a <br /> problem for failure to employ weed control methods for state listed noxious weed species within the permitted <br /> area, and to reduce the spread of weeds to nearby areas as required by Section 3.1.10 (6) of the rule. <br /> CORRECTIVE ACTIONS:The operator shall develop a weed control and management plan in accordance with <br /> Section 3.1.10 (6) of the Rule. This plan should be developed in consultation with the county extension agency, <br /> or weed control district office and should include specific control measures to be applied, a schedule for when <br /> control measures will be applied and a post-treatment monitoring plan. This weed control plan shall be <br /> submitted to the Division as a Technical Revision to the approved plan with the appropriate Technical Revision <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.