My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-28_REPORT - M1999006
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999006
>
2016-07-28_REPORT - M1999006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 10:26:49 PM
Creation date
7/29/2016 1:00:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
Report
Doc Date
7/28/2016
Doc Name
Annual Fee/Report/Map
From
Kurtz Resource Recovery & Land Development Project
To
DRMS
Annual Report Year
2016
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br /> 112c Annual Report <br /> Permit Number: ►N1�1 q �•CAS <br /> Itger. Y , Perrnittee Name: Varra-Companies,Inc. <br /> a ��16 Operation Name: Kurtz Resource Recovery&Land <br /> �IUL Development Project <br /> oMSIONOF RECLAMATION, County: Weld <br /> Anniversary Date: August 4, 2016 <br /> POR Current Bond Amt: $333,800.00 <br /> Annual Fee Due: $791.00 <br /> (DRMS Office Use Only) Permit Acreage: 29 <br /> DRMS Specialist: SH <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> SUMMARI' \ARRATIVE: The permit «as rep iced b-% Technical Re\ision as appro\ed bN the Colorado Office of Mined <br /> Land Reclamation (OMLR)on 20 No\ember 2009 Extraction continues «]thin Tract A. primarily \\]thin the existing <br /> basin limits. <br /> There have been no chan,_�es to the extent or nature of plant and processing operations over Tract B. Construction of the <br /> conve}or s\steni detailed under an O%ILR Technical ReN ision as appro\ed on 6 September 2011. has been completed and <br /> is in operation status since FebrUat') 2013. <br /> Tract C \sas opened follo,,i in(-, the OMLR approval of a -Technical Re,.ision on 23 August 2011. The 1 1.67t acre <br /> extraction limits «ere reached in 2012. and extraction at this Tract is completed. Final Trading is nearing completion. <br /> pending back-fill to 100 feet from existing «ell heads identified in the Technical Re\ision. ONerall depth of the basin is <br /> approximately 30.0± feet along the«est extent. No other grading or reclamation at Tract C or over the Kurtz permit area <br /> is anticipated at this time. A Technical Res ison or ,amendment ma\ be pro\ided later in 2016-17 to pro\ide for the lining <br /> of all basins at the Kurtz operation. commencing ss ith Tract C. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(l). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? On Going, <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.