My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-28_REPORT - C1982056
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2015-07-28_REPORT - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:27 PM
Creation date
7/29/2016 10:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
7/28/2015
Doc Name
Request for Extension to Submit Annual Hydrology Report, Including Draft Of Annual Hydrology Report
From
Twentymile Coal, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Hydrology Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Also: about 130 feet below the Wadge seam is the Wolf Creek Coal Seam. TC began rampling down from the <br />Wadge to the Wolf Creek seam in October 2014. Following development of the ramp and an initial gate road, <br />mining of the Wolf Creek Coal Seam began in March 2015. <br />Wadge Overburden: Five Wadge Overburden wells (009-79-4, 006-82-74C, 91M006, 008-77-58, and <br />93M001) are currently monitored. Water quality sampling is required annually. All monitoring requirements <br />were completed at these sites. Tables 2 through 6 provide summaries of the 2015 Water Year data. Tables 2a <br />through 6a provide some historical statistical summaries of collected data at each site through 2015. Figures 3 <br />through 11 provide graphical representations of water levels and selected water quality parameters recorded at <br />each site. <br />The potentiometric surface in the Wadge Overburden generally slopes from south to north in monitored wells in <br />the vicinity of the TC facilities, as shown by water levels in wells 009-79-4, 006-82-74C, and 91M006. During <br />2015, the water levels in well 009-79-4 (Figure 3) continue to be comparable to previous years going back to <br />1984. Well 009-79-4 (Figure 4) had exhibited a general decline in total dissolved solids since 1995, which has <br />stabilized since about 2000. Well 006-82-74C (Figures 5 and 6) water levels have been relatively stable since <br />1999, although 2008 did exhibit a slight drop, and has subsequently stabilized through 2015. TDS measurement <br />for 2005 indicated a new high and has generally dropped off to date, however the levels seen since are still within <br />historic ranges. Well 91M006 (Figure 7) has exhibited a steady decline in water level beginning in 1992, which <br />relates to dewatering impacts from the underground mining operation. These levels have appeared relatively <br />stable over the last four years. <br />Well 008-77-58 (Figure 8) has been unaffected by mining and exhibits seasonal water level fluctuations. During <br />1998, this well experienced an unusually long seasonal decline, and subsequently an established recovering water <br />level trend resumed. In 2015 TDS concentrations (Figure 9) remain at consistent levels seen since the mid 1990s. <br />The potentiometric surface reflected by well 93M001, has generally been observed to slope from southwest to <br />northeast. Well 93M001 (Figure 10) has exhibited a steep decline in water level from 1994 through 2002. From <br />2002 TDS appears to be stable. These earlier declines were associated with underground mining of the Eastern <br />Mining District (EMD). TDS concentrations (Figure 11) in this well remain very stable. <br />No anomalous water quality impacts attributable to mining were evident in data collected from Wadge <br />Overburden wells during 2015, as compared to historical results. <br />Twentymfle Sandstone: One well, 006-BRDH-7, requires monitoring for water levels and field parameters on a <br />semi-annual basis, and two wells, FBR-2, and 97013TM, required monitoring for water levels, field parameters, <br />on a semi-annual basis, and water quality parameters on an annual basis. Water quality frequency is annual. All <br />monitoring requirements were completed at these sites during 2015. Tables 7 through 9 provide summaries of <br />the 2015 Water Year data collected at each site. Tables 7a through 9a provide historical statistical summaries of <br />collected data. Figures 12 through 17 provide graphical representations of water levels and selected water <br />quality parameters recorded at each site. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.