My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-27_PERMIT FILE - C1982056A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-07-27_PERMIT FILE - C1982056A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 8:32:00 AM
Creation date
7/29/2016 7:54:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
7/27/2016
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1�1 <br />Unloading operations typically occur at the Haulroad B railroad crossing, where equipment access to the tracks is <br />available. Typically, unloading operations occur on the north side of the tracks, TCC will install a push -wall at this site <br />to facilitate the cleanup of coal in those instances where temporary ground storage is required. The push -wall will <br />consist of pre -formed concrete traffic barriers strategically placed to provide a backstop against which equipment can <br />operate to retrieve coal. <br />Additional measures will be implemented at this site to minimize sediment contributions to the adjacent Foidel Creek <br />stream channel. Drainage from the immediate area of the temporary coal storage site will be routed to an existing rock <br />filter as depicted on Map 24, and berms will be maintained at the site to ensure the rock filter is not bypassed. Buffer <br />zone signs will be erected at the site to assure that personnel operating equipment in the area are aware of Foidel Creek. <br />Lastly, excess coal accumulations resulting from unloading operations will be removed in a timely fashion. <br />A second off-loading point will be established at the railroad crossing located just south of the Foidel School House. I - <br />beams will be driven into the ground at this point with boards attached to create an L-shaped push -wall. Pre -formed <br />concrete traffic barriers will be placed in front of this wall to provide a backstop against which equipment can operate <br />to retrieve coal. Approximately 25 yards of compacted fill will be placed on the railroad track side of the I-beam <br />structure to provide a level surface for the off-loading and coal cleanup operations. Bonding modifications to address <br />the removal of this structure are presented in Appendix A, Volume IA. Excess coal accumulations resulting from <br />unloading operations at this site will be removed in a timely fashion. <br />(8) ............ Coal Proppssing_Waste and_Non-Coal_ProcessingWaste <br />A narrative explaining the construction, modification, use, maintenance removal and reclamation of coal <br />processing and non -coal waste removal handling storage transportation and disposal areas and structures in the <br />permit area_in_accordance_with_sections_ 4,_10_and_4:11_including appropriate_maps,_which_meet the_requirements_of <br />2 10 explarnmgthe location of each_source of wastewaste storage areaand waste drsposal_facllity, <br />TR07-59 2.05-89.1 02/27/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.