Laserfiche WebLink
AV <br /> U.S. DEPT. OF THE INTERIOR "'�iOf <br /> ( JUL n 2016 OFFICE OF SURFACE MINING <br /> 1 <br /> Tl6ttl Mine Site Evaluation <br /> 9 �,10N OF RECLAI�1► <br /> ,e., ®M ANp SAFfEIY State Program �svau <br /> MtN1NG <br /> 1.Permittee/Person 9.Permit Number 10.Permit Type <br /> TRAPPER MINING INC C-81-010 I T <br /> 2.Address 11. Field Visit Date 12. Purpose 13.SRA Present <br /> PO UO\ 187 7/6/2016 10113 <br /> 3.City 4. Slate 14. Permit Status IS. Site Status 16.Facility T pe <br /> CRAIG F CO AI' D JAGII <br /> 5. Zip Cade 6. Phone Number 17. OSM Office M 1(8�,CCID 9 19.Land Code <br /> 81626 (970)824.4401 140 -I l SF <br /> 7. O erator Name,if Different than Permittee 20.M.S.H.A.ID 4 21, Stale Abbrev. 22.Count /Burrough <br /> TRAPPER MINING INC 05.02838 CO F—FAT <br /> 8. Mine Name 23. AVS Permittee Entity ID Number 24, State Office <br /> TRAPPER MINE 190118 1 1 <br /> 25. Hours 26. Signature Block 11/11I 27. evietving flit:n1: <br /> 4,0 n. Permit Review d- '= �.r/� <br /> 8.0 b. Site Visit Time Signature Signature <br /> SA c. Travel Time Christine tielku,11)91182 Revicw Date: 6 –/ ZZ <br /> I'rinlcd Name mm-dd•»)r <br /> 3.0 d. Report Writing <br /> Date: 7/13/101= Is Supplemental MISE Page Used YIN Qv <br /> Pormk Typo-Item 10 IP=Interim Program PP=Pormanent Program NP=No Permit <br /> urpoao Typo Codes-Itam 12 CCR_Cflizen Complaint Referral(non-site visit <br /> Oxx..Oversight RFx.Redamatjcn Fees CC...Citizen Complaint(Initial site visit) <br /> Axx.-Assistance Fax..Federal Actions CCF...Asslstanca <br /> o nt nepect on• tam 3 A joint inspenon is when a state inspector accompanies an oshi inspector at any Lime during the review of the mire site <br /> Parrnit Status•Item 14 AB Abandoned: All surface and underground coal mining activities have ceased and operator <br /> A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as darned In 30 CFR 840,11(g). <br /> disturbed AB1 Bond Fortailuro Bond forfeiture officially In process or completed and reclamation In <br /> IN Inactive(Permanent Program Permil): Phase II completed or progress or not yet commenced <br /> Temporary Cessation of Operations. (Interim Program Permit): A132 Partially Reda'med Forfeits Forfeited site where all bonds have been used to reclaim site. <br /> Coal mining completed and reclamation activities Initiated. but site not reclaimed to Program standards. <br /> BR Bond Release: Redamation completed and State Regulatory A03 Redaimed Fodelture Forfeited site that has been reclaimed to Program standards. <br /> Authohty(RA)has released all of the bond(Phase Ill Release). NA Not Applicable When a to Is unperrmitted <br /> Site Statue-Ilam 16 MC Mining Complete No min'ng activity on site,aito NS Non-Site Visit Status of site not determined <br /> No No Disturbance: No coal mining and reclamation regraded and awa,Gng bond release Forfeiture Pending The RA is pursuing actions to <br /> operations have been started. TC Temporary Cessation: The RA has granted FP revoke the permit,collect the performance bond(s), <br /> EX Coal Exploration Coal exploration operations have cessation of mining pursuant to 30 CFR end/or reUamation of forfeited site Is In progress <br /> started and where coal m ning operations have not 8161817.13(b). FR Forfeited and Reclaimed Forfeiture reclamation <br /> begun. P1 Phase I Release; At feast Phase I bond release completed <br /> AP Active Coal Producing: Coal surface mining granted for on6ro permitted area For Interim FO Abandoned Sate Abandoned site that Is permitted but <br /> activities are occurring. pamtlts,partial bond release there Is no bond, <br /> AN Active Non-Producing Active non-producing farAty P2 Phase It Release: At least Phaso II bond re'ease WC Wideal: Coal mining and redamaticn operations have <br /> such as tipple or preparation plant. for the entire permitted area, or are taking place and the activity is not covered by <br /> Nh1No Mining The Permit Status Is active,site Is not In P3 Phase III Release: Reclamation completed and the required permits from the RA. <br /> Temporary Cessation,no surface coal mining the RA has released a'I bond, <br /> activity,and site not regraded <br /> Facility Type Codes-Item 16 D Ancillary(Haulroad,Conveyor,andror Rails H_Exploration Permits K. Government Financed Construction Exemption <br /> A, .Surface E..Refuse andfor Impoundment I .Notice of Intent to Explore L Remining site permitted under 30 CFR 785 25 <br /> B. .Urderground F Loading Facility and/or Tipple J..Exempt 16 and 2/3 <br /> C, Preparation Plant G...Smckpies <br /> Small Businees Regulatory Enforcement Fairness Act(SBREFA) <br /> Your Comments are Important <br /> The Small 6us'nass and Agnotltsxe Rey-ilatory Erlorcement 0mtudsman and 10 Regional Famess Boirds were WIN shad to receive comments from stroll buslmessos stout Federal eg�y <br /> enlorumeM Oelierte.The Ombudsman x11 rxvwaay eva'uate the edorcamenl0tWtes and rile each agency's responslviinasIto 5-mal M:ness tf you era a smW business(s but mess SIMM Cr <br /> fever emooyess tncl,rdn9 those of afaaates)end wlsh to commAnl on the enforcemenh orcomptance zeMtias of OSM,call 1.868•13EG-FAIR(i-llae-734-3247). <br /> Page t <br /> i <br />