Laserfiche WebLink
June 27, 2016 C-1981-010/Trapper Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 4 of 11 <br /> <br />East Flume W Inlet erosion, embankment sparse <br />on veg, burrows at top of spillway <br />Deer dry proposed to be released with SL 17 <br />Ute W <br />Deal W <br />Far East Buzzard <br />dry <br />animal burrows need to be filled in <br />around the embankment of the <br />outfall <br />Coyote dry <br />No-Name #2 W/D wood in emergency spillway <br />No-Name #4 W/D trash rack needs to be repaired <br />No-Name #5 W/D vegetation needs to be cleaned <br />from spill way <br />Johnson #6 <br />W/D <br />Remove old drop pipe materials and <br />finish repairs on new trash <br />rack/outer ring guard <br />Johnson #7R W/D vegetation needs to be cleaned <br />from spill way <br />Johnson #8R W/D spillway cement repair <br />Johnson #9 W/D spillway cement repair and <br />vegetation removal <br />Johnson #10R W/D Rip-rap slumping along fence <br />West Pyeatt #1 W <br />West Pyeatt #2 dry Wild Rye in spillway <br />Middle Pyeatt #1 dry Wild Rye in spillway <br />Middle Pyeatt #2 dry Wild Rye in spillway <br />Middle Pyeatt #3 dry Wild Rye in spillway <br />East Pyeatt #1 W/D <br />East Pyeatt #2 W/D <br />East Pyeatt #3 W/D <br />Grouse #1 <br />dry <br />eroded along the fence, needs <br />maintenance to meet side slope <br />embankment design specifications <br />Grouse #2 dry <br />Sage #1 dry <br />Sage #2 dry <br />Oak #1 W <br />Oak #2 W Wild Rye in spillway <br />Industrial Waste Pond W/D <br />Impoundment H <br />dry <br />no erosion, good dissipation of <br />energy from culvert in compliance <br />w/ Rule 4.05