Laserfiche WebLink
Page 70 of 371 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Haul Cover Material from Gob Pile #3 to Gob Pile #2 <br />Site: Bowie No. 2 Mine Permit Action: SL1 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 045 State: Colorado Abbreviation: None <br />Date: 3/8/2016 County: Delta Filename: C083-045 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: CAT 950H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $12.83 $22.19 NA NA NA NA <br />Operating cost/hour: $54.86 $40.19 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $0.00 $38.60 NA NA NA NA <br />Unit Subtotals: $67.69 $100.98 NA NA NA NA <br />Number of Units: 4 1 0 0 0 0 <br />Group Subtotals: Work: $371.74 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $371.74 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 58,943 CCY Swell factor: 1.165 <br />Loose volume: 68,669 LCY <br />Source of estimated volume: Volume IX, Appendix A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00