Laserfiche WebLink
Page 62 of 371 <br /> <br />CIRCES Cost Estimating Software <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 0.646 Minutes Adjusted for site altitude: 0.673 Minutes <br />Truck Maneuver and Dump <br />Time: <br />0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 1” tire <br />penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 500.00 0.00 4.00 4.00 2665 0.285 <br />Haul Time: 0.285 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 500.00 0.00 4.00 4.00 2849 0.201 <br />Return Time: 0.201 minutes <br />Total Truck Cycle Time: 2.559 minutes <br />Loading Tool unit <br />Production <br /> <br />469.83 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />389.96 <br /> <br />LCY/Hour <br />Truck Unit Production <br />215.35 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />178.74 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 357.49 LCY/Hour <br />Adjusted single truck/loader team production: 357.49 LCY/Hour <br />Adjusted multiple truck/loader team production: 357.49 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 909.13 Hours <br /> <br />Unit cost: <br /> <br />$0.924 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$300,303