Laserfiche WebLink
Page 53 of 371 <br /> <br />CIRCES Cost Estimating Software <br /> <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.690 Minutes Adjusted for site altitude: 1.690 Minutes <br />Truck Maneuver and Dump <br />Time: <br />0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2” tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 5280.00 10.00 5.00 15.00 734 7.199 <br />Haul Time: 7.199 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 5280.00 -10.00 5.00 -5.00 2938 1.853 <br />Return Time: 1.853 minutes <br />Total Truck Cycle Time: 12.142 minutes <br />Loading Tool unit <br />Production <br /> <br />318.08 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />264.01 <br /> <br />LCY/Hour <br />Truck Unit Production <br />57.37 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />47.62 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />6 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 190.47 LCY/Hour <br />Adjusted single truck/loader team production: 190.47 LCY/Hour <br />Adjusted multiple truck/loader team production: 190.47 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 10.50 Hours <br /> <br />Unit cost: <br /> <br />$1.952 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$3,903