Laserfiche WebLink
Page 46 of 371 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br />Cycle Time: <br />Scraper Loading Time: 0.90 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 6750 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />NA <br />Travel Time: <br /> Road Condition: Rutted dirt, little maintenance, no water, 2” tire penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 1000.00 -15.00 5.00 -10.00 1749 0.69 <br />Haul Time: 0.69 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 1000.00 15.00 5.00 20.00 868 1.17 <br />Return Time: 1.17 minutes <br />Total Scraper team cycle time: 3.36 minutes <br />Adjusted for job conditions: 539.70 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 539.70 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 539.70 LCY/Hour <br />Unadjusted unit production/hour: 650.25 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 1.51 Hours <br /> <br />Unit cost: <br /> <br />$1.109 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$904 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />