Laserfiche WebLink
Page 36 of 371 <br /> <br />CIRCES Cost Estimating Software <br />Truck Cycle Time: <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />Truck Load Time: 2.200 Minutes Adjusted for site altitude: 2.200 Minutes <br />Truck Maneuver and Dump <br />Time: <br />1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 600.00 0.00 3.00 3.00 2983 0.764 <br />Haul Time: 0.764 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 600.00 0.00 3.00 3.00 3569 0.381 <br />Return Time: 0.381 minutes <br />Total Truck Cycle Time: 5.145 minutes <br />Loading Tool unit <br />Production <br /> <br />832.76 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />691.19 <br /> <br />LCY/Hour <br />Truck Unit Production <br />469.39 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />389.59 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 779.18 LCY/Hour <br />Adjusted single truck/loader team production: 691.19 LCY/Hour <br />Adjusted multiple truck/loader team production: 691.19 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 89.33 Hours <br /> <br />Unit cost: <br /> <br />$0.981 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$60,581