Laserfiche WebLink
Page 18 of 371 <br /> <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />Task description: Pull Back Material @ Old Truck Loadout Material Storage Area <br />Site: Bowie No. 2 Mine Permit Action: Post SL1 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 4/11/2016 County: Delta Filename: C083-006 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13’-7” Stick Horsepower: 404 <br />Attachment 1: ROPS Cab Weight (MT): 70.51 <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $94.13 NA <br />Operating Cost/Hour: $141.12 100 <br />Operator Cost/Hour: $35.36 NA <br />Total Unit Cost/Hour: $270.61 <br />Total Fleet Cost/Hour: $541.21 <br />MATERIAL QUANTITIES <br />Initial volume: 9,790 CCY Swell factor: 1.165 <br />Loose volume: 11,405 LCY <br />Source of estimated volume: Page 3.02-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Load Bucket Capacity <br /> <br />Rated Capacity: 3.61 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 6500 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 LCY/Hour <br />Adjusted Hourly Unit Production: 268.09 LCY/Hour <br />Adjusted Hourly Fleet Production: 536.18 LCY/Hour <br /> <br /> <br />Basic Job Condition Description: SEVERE <br />Secondary Job Condition within Basic Description: SEVERE <br />Cycle Time Value: 0.570 minutes <br />Bucket Size Class: Small