My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-25_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2016-07-25_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:06 PM
Creation date
7/26/2016 8:08:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
7/25/2016
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> <br />Bowie Resources, LLC (BRL) applied for partial bond release under the Colorado Surface Coal <br />Mining and Reclamation Act following reclamation of the Bowie No. 2 Mine. The mine is located <br />in Delta County, in all or portions of the following: <br /> <br />Township 13 South, Range 92 West of the 6th P.M. <br />Section 01: SW¼NE¼ <br />Section 11: NE¼NE¼ <br />Section 12: Lots 3 <br /> <br />Township 13 South, Range 91 West of the 6th P.M. <br />Section 02: W½SW¼ <br />Section 03: Lots 3-4, S½NW¼, SW¼, N½SE¼, SW¼SE¼ <br />Section 04: Lots 1-2, SW¼SW¼, N½SE¼, S½S½NE¼ <br />Section 05: S½SW¼SE¼, N½NE¼SW¼ <br />Section 06: S½NE¼, Lots 5-6, SE¼SW¼, SE¼SE¼ <br />Section 07: SE¼NE¼, Lot 4, SE¼SW¼, SE¼ <br />Section 08: N½NE¼, S½NW¼, SW¼ <br />Section 09: W½SW¼NE¼, NW¼, NE¼SW¼, SE¼ <br />Section 10: E½NE¼, NW¼NE¼, NW¼NW¼, SW¼ <br />Section 11: W½NW¼ <br />Section 14: N½NW¼ <br />Section 15: E½NE¼, N½NW¼, N½NE¼SE¼ <br />Section 16: N½NE¼ <br />Section 17: NW¼NW¼ <br />Section 18: N½NE¼ <br /> <br />Township 12 South, Range 91 West of the 6th P.M <br />Section 33: Lots 7-8, and 16 <br />Section 34: Lots 3, 5, 7-16 <br />Section 35: SW¼ Lot 18, NW¼ Lot 19 <br /> <br />Reclamation History of Bond Release Area <br /> <br />The total permit area of the Bowie No. 2 Mine is presently 10,987.40 acres. The total approved <br />disturbed acreage of the Bowie No. 2 Mine is 410.03 acres and the total approved affected area is <br />7,051.01 acres. The Bond Release Application No. 1 (SL-01) represents the first bond release <br />application processed by the Division. <br /> <br />Submittal of Bond Release Application and Completeness Determination by the Division <br /> <br />The Division received BRL’s bond release application SL-01 on June 17, 2015. The initial SL- <br />01 application included 23 drill sites and nine roads representing 17.1 acres eligible for Phase I <br />bond release. Phase I bond release was also requested for 4.0 acres of backfilled and regraded <br />lands associated with the Pitkin Mesa Pipeline disturbance corridor and 7.4 acres on Gob Pile #1
The URL can be used to link to this page
Your browser does not support the video tag.