Laserfiche WebLink
Page 11 of 371 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Pull back and Haul Portal Bench Fill Material to Cut Slope <br />Site: Bowie No. 2 Mine Permit Action: Post SL1 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 4/11/2016 County: Delta Filename: C083-001 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: Cat 365C L 13’-7” Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $82.18 $94.13 NA NA NA NA <br />Operating cost/hour: $117.80 $141.12 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $22.10 $35.36 NA NA NA NA <br />Unit Subtotals: $222.08 $270.61 NA NA NA NA <br />Number of Units: 2 1 0 0 0 0 <br />Group Subtotals: Work: $714.77 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $714.77 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00