Laserfiche WebLink
Table 1 <br />SL-01 (82.93 acres)Total (410.03 acres) <br />Phase I - 60%$1,460,603.26 $7,223,557.20 <br />Phase II - 25 %$608,584.69 $3,009,815.50 <br />Phase III - 15%$365,150.81 $185,889.30 <br />Total $2,434,338.76 $12,039,262.00 <br />Maximum Bond Release Amounts per Rule 3.03.1(2) <br /> <br />Table 2 <br /> <br />Proposed <br />Released Acres <br />% of <br />Acreage <br />Phase I $1,460,603.26 82.93 20.22% <br />Phase II $332,652.39 45.33*11.05% <br />Phase III $18,038.45 4.1*1.00% <br />Total $1,811,294.10 <br />Eligible for Release Under SL-01 <br />*(45.33 acres=54.66% of 82.93 acres and 4.1 acres=4.94% <br />of 82.93 acres) <br /> <br /> <br />The eligible bond release amounts identified in Table 2 are the maximum amounts eligible for <br />release per Rule 3.03.1(2). Per Rule 3.03.1(3)(d), the Division shall not release any amount under <br />performance bonds applicable to a permit if such release would reduce the total remaining amount <br />to an amount less than that necessary for the Division to complete the approved reclamation plan. <br />Based on the Division’s review, the Division will retain a minimum of $10,606,843.82. A site wide <br />reclamation cost estimate for the Bowie No. 2 Mine was updated with the SL-01 application, with <br />the total reclamation liability amount prior to the approval of SL-01 is $12,039,262.00. The current <br />required liability for the Bowie No. 2 Mine is $12,082,485.85. Accordingly, the proposed release <br />amount for this SL-01 is $1,475,642.03 ($12,082,485.85- $10,606,843.82). The $1,475,642.03 is <br />less than the eligible bond release amount of $1,811,294.10. The remaining $10,606,843.82 is <br />sufficient to assure completion of the remaining reclamation work at the site if the work had to be <br />performed by the Division, including the cost of reestablishing vegetation on any revegetated areas, <br />should those areas fail (Rule 3.03.1(3)(a) and 3.01.3(3)(d)). <br /> <br />Table 3 <br /> <br />Initial Liability Total <br />SL-01 Sitewide RCE $12,039,262.00 <br />Surity Releases to Date Acres Amount Acres Amount Acres Amount <br />SL-01 82.93 $1,460,603.26 45.33 $332,652.39 4.10 $18,038.45 <br />Total*82.93 $1,460,603.26 45.33 $332,652.39 4.10 $18,038.45 <br />Bowie No. 2 Mine (C-1996-083) Bond Release History <br />Phase I Phase II Phase III <br />*a total of $1,811,294.10 is eligible for release; however, per Rule 3.03.3(d) only $1,475,843.82 was released under <br />SL-01