Laserfiche WebLink
Page 83 of 371 <br /> <br />CIRCES Cost Estimating Software <br /> <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.180 Minutes Adjusted for site altitude: 1.180 Minutes <br />Truck Maneuver and Dump <br />Time: <br />0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2” tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1000.00 5.00 5.00 10.00 1068 0.950 <br />Haul Time: 0.950 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1000.00 -5.00 5.00 0.00 2938 0.365 <br />Return Time: 0.365 minutes <br />Total Truck Cycle Time: 3.895 minutes <br />Loading Tool unit <br />Production <br /> <br />391.61 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />325.03 <br /> <br />LCY/Hour <br />Truck Unit Production <br />168.91 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />140.19 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />1 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 140.19 LCY/Hour <br />Adjusted single truck/loader team production: 140.19 LCY/Hour <br />Adjusted multiple truck/loader team production: 140.19 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 41.55 Hours <br /> <br />Unit cost: <br /> <br />$1.203 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$7,008 <br />