Laserfiche WebLink
Conclusions <br /> There are no indications that the seepage is currently affecting waste dump stability,or poses a future threat to <br /> waste dump stability. However, as part of the overall Ground Control Management Plan at CCV, LiDAR scanning <br /> and visual inspections of the waste dump in and around the seepage area will continue. The results of the <br /> monitoring will be documented in internal monthly Geotechnical Section reports,which will be copied to the <br /> CCV S&ER Department. <br />