Laserfiche WebLink
Pipe Route <br /> The temporary fresh water source will originate at the Altman Pump station and be conveyed to <br /> site through the existing Bull Hill 1 12 inch line. The water will then be piped via Pipeline E, a 10 <br /> inch pipe, which carries water to the ADR2. Pipeline E will be intercepted near the Load Out Bin. <br /> A series of fittings and valves will be put in to allow water to be pumped/directed into a new 8" <br /> line. The new line will be laid on the surface and run parallel to the Delivery haul road. The line <br /> will be buried at haul road crossings on the way up to the Mill water tank. The new 8" line will be <br /> spliced into the current mill tank feed line just above the control valves at the tank. Figures 1 <br /> and 2 below show the trace of the new line from the tie in to the Pipeline E up to the mill tank <br /> tie-in. The water will then gravity flow in existing lines back to the HGM. <br /> AM <br /> � f <br /> r <br /> � a <br /> w. <br /> r <br /> .µ <br /> i <br /> w r 9 <br /> Figure 1. Fresh water source (light blue) originating from Altman Pump station (off map) to Bull <br /> Hill 1 line and Pipeline E. <br />