Laserfiche WebLink
RECEIVED <br /> JUL 2 5 2016 Page 2 of 3 <br /> DIVISION V,- i<c(LAMATION, <br /> MINING TY-MINERALS 112c Annual Report <br /> N FM EPOR P <br /> Permittee Name: The Denver Brick Permit Number: M-1977-392 <br /> Company <br /> Operation Name: Dawson Mine County: Elbert <br /> Annual Fee Due: $791.00 Anniversary Date: March 11,2015 <br /> Pen-nit Acreage: 28.85 Current Bond Amt: $80,358.00 <br /> According to C.R.S.34-32.5-116 or 34-32-116,each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). ES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES N� <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year?- j fA-) y rd YES <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES <br /> b)approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). 10 <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. ( <br /> 10. Estimated new acreage to be affected in the next report year. 2- <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began. <br /> rbackfille:d: <br /> al acr Total acres Total acres Total acres <br /> seeded w/ w/topsoil mulched w/ <br /> a roved mix: 620 re laced: 920 a roved mulch: <br /> al acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ oZ0 replacement rate(tons/ac): <br /> a vd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application bi ;O tZ.j d44,.P application application <br /> method: method: method: <br />