My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-25_REVISION - M2012016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012016
>
2016-07-25_REVISION - M2012016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:12 PM
Creation date
7/25/2016 1:47:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012016
IBM Index Class Name
Revision
Doc Date
7/25/2016
Doc Name
Additional Information
From
SGM Inc
To
DRMS
Type & Sequence
TR2
Email Name
ACY
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P CA <br /> t:531GM <br /> July 11, 2016 <br /> Ms.Amy Yeldell "/J UL 2 5 2016 <br /> Division of Reclamation <br /> Mining and Safety DIVISION OFRECLAMAT;ON <br /> 1313 Sherman Street, Room 215 MINING AND SAKr' <br /> Denver, CO 80203 <br /> RE: Nolte Pit#1 <br /> Permit#M-2012-016kl- <br /> Technical Revision Submittal-Additional Information `fi f-Z4sa— <br /> Dear Amy, <br /> The purpose of this letter is to resubmit the attached technical revision for the Puckett Land Company <br /> Nolte Pit #1. This submittal follows your correspondence of June 27, 2016. From your recent <br /> correspondence, this letter is intended to serve as a narrative to the Technical Revision to be used in <br /> conjunction with the revised map of the Reclamation Plan Update for 2016. Accordingly, you will find <br /> attached the following: <br /> 1. A map of the Reclamation Plan Update for 2016 <br /> TECHNICAL REVISION NARRATIVE <br /> The map of the Reclamation Plan Update has been prepared to reflect needed improvements to the <br /> seeding and terracing that exists on site. On this map, we have identified four separate areas of <br /> treatment that are to be employed to this site to enhance potential success in revegetation in the areas <br /> deemed deficient from our May survey of the site. These areas are noted as follows: <br /> 1. SR- Surface Roughening- to consist of raking, plowing, discing or micro-pocketing using hand <br /> tools or by mechanical means based upon the area of question and accessibility. The purpose of <br /> this will be to eliminate observed rills in the slopes identified,trap sediment, increase infiltration <br /> and to aid in the establishment of vegetative cover. The surface roughening will be performed <br /> to create horizontal ridges and depressions across the slope. Following the surface roughening, <br /> an application of 18-46-00 fertilizer will be applied at a rate of 300# per acre and subsequently <br /> the slope will be hydro seeded at 24 #/acre with the Generic Seed Mix identified on the <br /> Reclamation Plan Update for 2016 Map. <br /> 2. HB- Hand Broadcasting- to consist of broadcasting the previously referenced Generic Seed Mix <br /> at a rate of 48 #/acre using a hand spreader (This is double the rate for drill seeding and hydro <br /> GLENWOOD SPRINGS 118 West Sixth St, Suite 200 1 Glenwood Springs, CO 81601 1 970.945.1004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.