My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-24_PERMIT FILE - M2016040
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016040
>
2016-07-24_PERMIT FILE - M2016040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:06 PM
Creation date
7/25/2016 8:24:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016040
IBM Index Class Name
Permit File
Doc Date
7/24/2016
Doc Name
Need permit
From
DRMS
To
Jol Lemons
Email Name
ERR
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is It mining <br />Page 12 <br />8. What is the approximate areal extent of the proposed extraction in acres? <br /><3 acres <br />9. To what approximate depth will the extraction extend? <br /><60 ft <br />10. In cubic yards, approximately how much material will be removed? <br />—35k yards annually. <br />1 l . WilI material extraction involve the use of explosives? <br />No. <br />12. Will site of extraction result in the exposure of tributary ground water? <br />No. <br />13. Will either the landowner or the mine site operator receive any type of compensation, i.e., <br />monetary, in-kind, haulage fees, etc., from the proposed material extraction? <br />No <br />14. Please supply a copy of any documents that will ensure that the area of extraction will be <br />reclaimed to some beneficial land use once extraction activities have been completed. <br />Slope established and reseeded with perennial grasses. <br />15. Do you have permits for this activity from any other governmental agencies such as building, <br />construction, or grading permits, and if so, what are they? <br />No. <br />16. Are there staterfederal: local agency participants in terms of funding (yes) -(no), design (yes) -(no). <br />What are the percentages? <br />No. No. NIA <br />17. What post mining uses will be made of the site of extraction and why? <br />(This question helps us determine the intent of the activity) <br />Rangeland. <br />18. What types and sizes of equipment will be used in the extraction? <br />Volvo 110G front end loader <br />Please send the completed questionnaire to the Division at the address above for review. The Board has <br />directed the Division to make a decision based on the information you have supplied. We trust that the <br />activities will be performed as represented. If we receive a complaint, we are required by law to conduct <br />an inspection of the site. Which could result in a violation, a cease and desist order, and other corrective <br />actions including submittal of a permit application. <br />If you have any question, please contact Wally Erickson for Eastern Colorado sites at (303)866-3567, ext. <br />8176, or Russ Means for Western Colorado sites at (303)866-3567, ext. 8185. If you are unsure which <br />area your project lies please feel free to contact either for further guidance and assistance. Please feel free <br />to visit our web site at: www.mining.state.co.us for further access to the full Act and Rules governing <br />extraction of metals, non-metals, and construction materials in the State of Colorado. <br />Sincerely, <br />Division of Reclamation, Mining and Safety Staff <br />Enclosure: Rule 1.2.1 for both Hard Rock Metal Mines and Construction Materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.