Laserfiche WebLink
4 <br /> 14 <br /> 13 <br /> �X, <br /> S IN POND-005 A <br /> P <br /> J <br /> P�WD-003A <br /> 0 <br /> 4 , <br /> 23 <br /> 24 <br /> 5 02 1 <br /> > <br /> V <br /> zoo� <br /> TA RP <br /> ING <br /> 5 <br /> 2 <br /> 8 <br /> 6 2 <br /> A <br /> Y <br /> 31 <br /> ........... <br /> WASH <br /> A t <br /> P <br /> r7; <br /> T3 <br /> WPM <br /> OR 10 c:) <br /> R <br /> 4 <br /> I Eno <br /> 2W <br /> POND I <br /> ........... <br /> # <br /> 8 <br /> 2w <br /> 2N3 <br /> 24A4w <br /> 0- <br /> ZP@37 <br /> 0 -01 J� <br /> PD2 <br /> C) <br /> EP2 <br /> NTEP1 <br /> T <br /> 01EP1 <br /> 17 <br /> ej <br /> N, <br /> CS <br /> &H <br /> - ----- ell <br /> SE <br /> B Ne <br /> on <br /> J <br /> 0 <br /> 4 <br /> 2 <br /> ---24Z <br /> X <br /> o0oo <br /> SE <br /> 0 <br /> N <br /> V <br /> --j <br /> 30 <br /> 2 <br /> 01 <br /> 7� <br /> r% <br /> LEGEND r <br /> JUL 19?016 <br /> PERMITBOUNDARY i�j!6 <br /> u L <br /> Coordirudes in NAD27 Cabrado Nof#p Zone,US Fo& Division of Reclamati <br /> ------ 29 1 28 27 26 25 -——r--———I i Division of Reclamation, Mining&Safety )n, <br /> SECTION LINE X 29 <br /> 28 27 26 25 30 29 28 Mit <br /> 32, 33 34 35 36 31 32 — 3-4 ---- <br /> POST-MINE DRAINAGE LOCATIONS (NOT INCLUDED IN BOND RELEASE AREAS) 8 9 167 11 33 35 36 31 32 33 T5N <br /> 7 8 7—L--L PHASE /11 BOND RELEASE AREAS <br /> 9- 12 7 8 9 T4N <br /> 17 16 15 14 13 16 14 18 17 16 <br /> r <br /> 20 21 22 1*=12W <br /> PHASE 111 AREA APPROVED PREVIOUSLY 24 19 20 21 41 24 1-9 20 21 SCALE. <br /> 3121116 <br /> DATE. <br /> Y.. TONY <br /> 29 28 26 25 30 29 28 26 25 30 29 28 DRWG.B <br /> COAL APPROVED BY. <br /> 32 33 34 35 36 31 32 33 35 36 31 32 33 1 , co <br /> T4N DRWG NO. <br /> 5 4 3 2 1 6 5 4 3 1 6 5 4 T3N <br /> — — — Colowyo Coal Company MAP 1 <br /> 8 1 9 5731 State HVway 13 <br /> PHASE AREA AS APPLIED FOR 10 11 12 8 9 10 12 7 8 9 Meeker,Cd"ado 81CAI <br /> 17 16 15 14 17 16 — — <br /> 1 15 064 13 18 17 16 No. REVISION DATE BY CHK <br /> MO FAT 10 <br /> Ria ILAJ 30 C( <br /> 6001 0 6W 1200' 20 21 22 23 24 20 21 A 23 i 24 19 20 21 <br /> 29 28 27 26 25 <br /> 30 <br /> PONDS 27 26 25 , 30 29 <br /> CONTOUR INTERVAL 25 FT M 35 36 31 321 33 34 35 <br /> TOPO DATE OCT 2015 <br /> LGSC <br /> SURFACE WATER MONITORING LOCATION cc <br /> NGSW <br /> L <br /> 0 GROUND WATER MONITORING LOCATION <br />